Sealway
Acceptance of works and reservations

What did this defect look like on the day of acceptance?

The acceptance report fixes the list of reservations. It does not show what they looked like, nor the state the area was handed back in after the repair. Six months later, that is exactly where the discussion goes. Sealway lets you document precisely the defects, imperfections or outstanding work at the moment of acceptance, then their lifting.

Built for

  • Project owners
  • Homeowners having works done
  • Contractors and tradespeople
  • Project managers
  • Developers and builders
  • Property managers and landlords

Acceptance fixes a list. It does not fix a state.

Yet everything that follows depends on what could be seen that day.

Acceptance is the moment everything turns: the project owner accepts the works, with or without reservations, and the guarantees start to run. What is visible and not under reservation that day becomes, in principle, hard to invoke later. What is under reservation must be repaired, then the repair recorded. In between, each side keeps its own photographs, usually without an independently established date.

Six months later, the discussion rarely bears on the list of reservations: the acceptance report fixes it. It bears on their appearance. Was this defect this extensive at acceptance? Was it properly repaired? Did this damage appear after the lifting? Those are questions of state on a given date, and that is precisely what a timestamped proof makes it possible to establish.

What French law attaches to acceptance.

Acceptance is not a formality: it triggers the guarantees and freezes what could, or could not, have been the subject of a reservation.

Code civil, art. 1792-6, para. 1

Acceptance: accepting the works, with or without reservations

Acceptance (réception) is the act by which the project owner declares that it accepts the works, with or without reservations. It is pronounced with all parties present, by agreement or, failing that, by the court. Service-Public.fr recalls that it is the common starting point of the one-year guarantee of perfect completion, the two-year guarantee of proper functioning and the ten-year guarantee.

Code civil, art. 1792-6, para. 2 et seq.

The guarantee of perfect completion

For one year after acceptance, the contractor is bound to repair all the defects notified by the project owner, either by way of reservations recorded in the acceptance report or by written notification for those revealed after acceptance. Service-Public.fr specifies that the request for repair is sent to the contractor by registered letter with acknowledgement of receipt, with a deadline for the work. Normal wear is not covered. The completion of the repairs is recorded by mutual agreement or, failing that, by the court.

Cour de cassation, 3rd civil chamber

Apparent defects that were not covered by a reservation

Acceptance without reservations covers apparent defects: a project owner who fails to make a reservation about a visible defect on the day of acceptance can no longer, in principle, claim its repair from the builders on that basis. That is what the courts regularly hold, including in the decision quoted below. Everything therefore turns on what was visible that day, and on what was written down.

Cour de cassation · 3rd civil chamber · 13 July 2016

Cass. 3e civ., 13 July 2016, no. 15-18.801

Partial quashing on another point · judgment under appeal: Montpellier Court of Appeal, 26 March 2015

Private owners have a building refurbished by a general contractor, whom they also appoint to represent them at acceptance, assisted by an architect with a full mission. The acceptance report is signed. The court-appointed expert later records defects on the staircase, a floor and an interior render, held to have been apparent at acceptance; none had been the subject of a reservation. The Montpellier Court of Appeal rules out the builders’ guarantee for those defects, but holds the representative and the architect contractually liable for having failed to make reservations about them.

The Cour de cassation dismisses the appeal on that point: those defects, apparent at acceptance, had not been the subject of any reservation.

Since acceptance has the effect of purging the works of the apparent defects and non-conformities not reported at acceptance in the form of reservations by the project owner or its representative, whether through inattention or negligence or deliberately, it amounts to a waiver of the right to invoke them later.

Reasons of the Montpellier Court of Appeal, reproduced in the grounds annexed to the decision; the appeal against this analysis was dismissed. Our translation.

What Sealway takes from it

What is visible on the day of acceptance must be covered by a reservation that day. And it is better to be able to show, later, what was.

Read the decision on the Cour de cassation website (in French) →

Three layers, on the day.

The acceptance report lists, the photographs show, Sealway dates. Together, the three form a file each party can produce, with a date that depends on neither of them.

What to document on the day of acceptance

  • each reservation: an overall view placing it, a detail view, a visible reference mark (reservation number, tape measure, label);
  • the equipment and its visible state: joinery, taps, electrical fittings, ventilation;
  • the finishes: floors, walls, ceilings, joints, paintwork, room by room;
  • the areas accepted without reservation, as they are handed over;
  • the signed acceptance report, scanned or photographed, in the same proof or in a dedicated one.
  1. 1

    Photograph during the acceptance

    From the app, reservation by reservation, in the order of the report. The certificate shows for each file that it was captured live.

  2. 2

    Attach the acceptance report

    The signed report, as a PDF or a photograph, joins the proof. The certificate distinguishes what was captured from what was imported: the report appears as an import, which is accurate.

  3. 3

    One proof per reservation or per package

    Up to 10 files per proof. Name it by reservation number and package: “reservation 4 · living-room window”, not “acceptance photos”.

  4. 4

    Do it again at the lifting

    After the repair, photograph the same points again, from the same angle, and create a new proof. The site’s collection shows before and after, dated separately.

Signed acceptance report: the list of reservations Photographs and videos of each reservation, on the day Sealway proof: SHA-512 fingerprints and qualified timestamp of the report and the images

The proof establishes that the report and the images existed, in this form, on this date. It replaces neither the signing of the acceptance report with all parties present, nor the written notification of a defect discovered later.

From acceptance to the lifting of the reservations.

Example on a refurbished flat: each stage is a separate proof, in the site’s collection.

  1. 12 Sept.

    Acceptance with six reservations

    Report signed. Each reservation photographed, overall view and detail. One proof per reservation, the report attached.

  2. 3 Oct.

    Contractor’s intervention

    Five reservations repaired. Reservation no. 4, a glazing unit, awaits the part.

  3. 5 Oct.

    After repair

    Same points, same angle. New proof. Partial lifting report signed and attached.

  4. 24 Oct.

    Reservation no. 4 lifted

    Glazing replaced, photographed, dated. Final lifting report.

The lifting of a reservation is recorded by mutual agreement or, failing that, by the court. The proof shows the state of the repaired area on that date; it is not the lifting itself.

Four moments where the state matters.

The day of acceptance

What is under reservation, and in what state. What is accepted without reservation, and in what state. Both will serve: the project owner for the repair, the contractor if later damage is attributed to it.

A defect revealed after acceptance

Photograph it as soon as it is found and create the proof before notifying it. The date of the proof establishes when you recorded it in this form; written notification remains necessary to notify the contractor (a registered letter with acknowledgement of receipt is recommended).

The lifting of the reservations

The same points, photographed again after repair. If the repair is disputed, or if the area deteriorates afterwards, each side holds the state on the date of the lifting.

At the end of the first year

The guarantee of perfect completion runs for one year. A dated state of the sensitive points before the deadline makes it possible to notify what has to be, with images whose date enjoys a presumption of accuracy.

Useful to both sides.

A proof of state is not one side’s weapon: it fixes what both saw.

For the project owner

Show the extent of a reservation on the day of acceptance, the state of a defect discovered later, and obtain a repair on the basis of what was recorded rather than what is remembered.

For the contractor

Fix the state handed over, areas without reservation included, and the state after repair. If a defect is reported months later, the contractor can show what was visible, or not, at acceptance and at the lifting.

For the project manager

Attend the acceptance with a dated file. The decision quoted above is a reminder: an architect charged with assisting the project owner may incur contractual liability for failing to make a reservation about an apparent defect.

Example: a scratched window, six months later.

  1. 12 Sept.

    Reservation no. 4

    12 cm scratch on the glazing of the left-hand sash in the living room. Three photographs, a reference mark, the report attached.

  2. 24 Oct.

    Glazing replaced

    Photographs of the new glazing from the same angle. Proof created, lifting report attached.

  3. March

    New scratch reported

    The project owner questions the repair. The contractor produces the proof of 24 October.

The proof of 24 October establishes the state of the glazing on that date, as the photographs show it. It does not say where the new scratch comes from nor who answers for it: that is a question of fact and of contract, for the expert where it comes to that. But it removes one unknown: nobody has to reconstruct from memory what was handed over.

What Sealway proves, and what it does not.

Sealway makes it possible to establish

  • that a photograph, a video or an acceptance report existed, in this form, on the date of the timestamp;
  • that these files have not been modified since;
  • that these images, which show the appearance of a defect under reservation or of a repaired area, existed as they are on that date, what they depict remaining a matter of assessment;
  • a chronology of acceptance, notification and lifting, when proofs were created at each stage.

Sealway does not, on its own, establish

  • the acceptance itself, nor the signing of the report or whether it can be relied on against the other party;
  • whether a defect was apparent or not, nor which guarantee it falls under;
  • the cause of a defect nor a contractor’s liability;
  • that the reservation is lifted in the legal sense: the lifting is recorded by mutual agreement or by the court;
  • the written notification of a defect to the contractor, for which a registered letter with acknowledgement of receipt is recommended.

The acceptance report, the notification and the lifting remain the parties’ acts. Sealway gives them images and documents whose date and integrity depend on nobody.

What a qualified timestamp changes for the acceptance and the reservations.

The acceptance report fixes the list of reservations; it does not show what they looked like. Photographs do, provided their date cannot be disputed. When the proof is created, the fingerprint of each file is bound to a qualified electronic timestamp issued by a qualified trust service provider.

  • SHA-512 fingerprint of each file: the proof bears on this exact version; modifying the file changes the fingerprint, and the fingerprint cannot be turned back into the file.
  • Qualified electronic timestamp: presumption of accuracy of the date and time and of integrity of the data (eIDAS Regulation, art. 41(2)). The date comes neither from the device nor from Sealway.
  • Evidence file verifiable without Sealway: certificate, manifest, timestamp token and fingerprints, with the references of the anchoring on public blockchains.
The mechanism in detail: create evidence from your files

Frequently asked questions

What project owners, homeowners and contractors ask before an acceptance.

What is a reservation at the acceptance of works?
A defect, an imperfection or outstanding work that the project owner reports at the moment it accepts the works, by recording it in the acceptance report. The contractor must remedy it under the guarantee of perfect completion, during the year following acceptance.
Is the acceptance report not enough? Why photograph the reservations?
The report fixes the list and the date. It rarely describes the exact extent of a defect, and it does not make it possible to compare the state before and after repair. Independently dated photographs complete the report on that precise point: what the reservation looked like that day.
Does Sealway replace the acceptance report?
No. Acceptance is an act between the project owner and the contractor, with both present, embodied in the signed report. Sealway makes it possible to date that report and the images that go with it, not to replace it.
What happens if a visible defect is not covered by a reservation?
In principle, acceptance without reservations covers apparent defects: the project owner can no longer claim their repair from the builders on that basis. The decision quoted on this page illustrates it. Hence the value of a meticulous, documented acceptance, with a professional’s assistance where needed.
A defect appears after acceptance. What should be done?
Photograph it as soon as it is found and create the proof, then notify the contractor in writing: Service-Public.fr specifies that the request is sent by registered letter with acknowledgement of receipt, with a deadline for the work. The proof establishes the date on which you recorded it in this form. The notification remains essential: Sealway does not send it.
How should the lifting of the reservations be documented?
Photograph each repaired point again from the same angle as on the day of acceptance, attach the signed lifting report, and create a new proof. In the site’s collection, the two proofs read side by side: the state under reservation, the repaired state, each on its own date.
Does Sealway prove that the reservation has been lifted?
No. The lifting is recorded by mutual agreement between the project owner and the contractor or, failing that, by the court. Sealway establishes the state of the repaired area on a given date, as the images show it. That is material for assessing the repair, not the lifting itself.
Who should create the proofs: the project owner or the contractor?
Either can, from their own account. The contractor documents what it hands over and what it repairs; the project owner documents what it reservations and what it discovers. The certificate of each proof names its depositor.
Can the signed acceptance report be attached to the proof?
Yes, as a PDF, a scan or a photograph, in the same proof as the images or in a dedicated one. The certificate sets it apart from the photographs captured from the app.
Can a homeowner use Sealway alone, without a project manager?
Yes. The app is used from a phone, on the day of acceptance. Sealway does not tell you what to make reservations about or how to word them: for a major acceptance, a professional’s assistance remains useful.
Can Sealway say which guarantee a defect falls under?
No. Whether a defect falls under the guarantee of perfect completion, the guarantee of proper functioning or the ten-year guarantee depends on its nature, its seriousness and when it could be detected. That qualification is for the parties, their advisers and, in case of dispute, the court. Sealway fixes dates and images.
How is this different from a commissaire de justice’s report at acceptance?
The commissaire de justice, a public and ministerial officer, describes what they record themselves; their report stands unless the contrary is proven, and it has a cost. Sealway lets the parties document the acceptance themselves, with dated, intact material. The two complement each other: one for the most sensitive acceptances or points, the other for everything else, and for the lifting.

References

Texts, decision and official documents cited on this page (in French).

Sealway does not provide legal advice. These references are given for information; the evidential weight of the material produced is for the court to assess, after an expert report where one is ordered. The French official sources are in French.

Document your acceptances and the lifting of your reservations.

One proof per reservation, on the day, then at the lifting: SHA-512 fingerprint, qualified electronic timestamp under eIDAS, evidence file verifiable by a third party. Join the waitlist to be notified at launch.

By signing up, you agree to be contacted by Sealway about the launch. No sharing with third parties.